-
Categories
- Low carbon 1
- 2050 Targets 1
- BSC 1
- RO 1
- CRM 1
- Disribution and transmission networks 1
- RESS2 1
- Future networks 2
- Carbon 1
- CfD 3
- Cannibalisation 1
- Capacity Payment Mechanism 1
- Fleet charging 1
- Shakespeare Martineau 1
- low-carbon 3
- Contracts for Difference 2
- Wholesale electricity price 1
- Ireland 1
- Electric Vehicles 1
- Generation 4
- self-sustaining 1
- Auctions 1
- Fuel costs 1
- Clearing price 1
- EV fleet transition 1
- Transmission systems 1
- Flexible 1
- Procurement 1
- Onshore wind 2
- Hydrogen 1
- Road map 1
- Wholesale market structure 1
- Investment 3
- Offshore Wind 1
- Solar power 1
- Support schemes 1
- Power system 1
- Generation mix 1
- policy 1
- I-SEM 1
- RIIO 1
- Hydrogen economy 1
- Net zero Transaction 1
- Network charges 1
- Network development 1
- SEM 1
- DNOs 1
- gas infrastructure 1
- Net zero Carbon emissions 1
- Balancing 1
- Wind turbine 2
- RESS 1
- DSOs 1
- carbon intensity 1
- transaction 1
- Congestion 1
- Electrification 3
- Community Energy Scheme 1
- ED2 1
- energy storage 1
- Insight paper 1
- Network access 1
- Road to Zero 1
- Consumer demand 1
- distribution network operator 1
- net zero 2
- Heat technologies 1
- CPPA 1
- Climate Change 2
- Crystallisation 1
- Capacity Remuneration Mechanism 1
- electricity market design 1
- merchant 1
- Energy purchasing 1
- Micro-generation export 1
- EV 1
- EirGrid 1
- cost variable renewables 1
- renewables 1
- Distribution System Operators 2
- Wind farms 1
- Feed-in Tariff 3
- Subsidies 1
- SONI 1
- Network innovation allowance 1
- devloper 1
- Flexibility 2
- Renewable 3
- Low-carbon generators 1
- FiT 1
- Capacity Auction 1
- National Grid Electricity System Operator 1
- wind 1
- Regional flexibility 1
- Decarbonisation 6
- Balancing and Settlement Code 1
- Renewable Obligation 1
- Regulatory Authorities 1
- Western Power Distribution 1
- wind farm 1
CfD
-
Low carbon generation
Merchant renewables still face challenges
In light of delayed RESS-2 auctions in Ireland, and the prospect of buying constraints in the next CfD auction (for established technologies) leading to many disappointed developers, the question of whether “merchant” project development is viable will soon be occupying the minds of our customers in both Ireland and Great...
-
Low carbon generation
Turn up the volume: reinventing CfD auctions
We argue that changes to the CfD regime should be closely examined to address several limitations in the targets, timings and integration of the auctions with the wider energy system and market landscape: The current approach does not ensure that CfD procurement meets the UK’s decarbonisation trajectory;Investors do not have...
-
Low carbon generation
Wholesale Power Price Cannibalisation
With the withdrawal of government subsidies for new investment, such as the Feed-in Tariff (FiT) and Renewables Obligation (RO), and the limited spend remaining for the Contract for Difference (CfD) scheme, the value earned from wholesale power is going to become increasingly important for renewables. However, a complicating factor will...