-
Categories
- Decarbonisation 6
- Generation 4
- Investment 3
- Feed-in Tariff 3
- CfD 3
- low-carbon 3
- Renewable 3
- Electrification 3
- net zero 2
- Flexibility 2
- Climate Change 2
- Contracts for Difference 2
- Wind turbine 2
- Onshore wind 2
- Future networks 2
- Distribution System Operators 2
- Regulatory Authorities 1
- gas infrastructure 1
- carbon intensity 1
- EirGrid 1
- Capacity Remuneration Mechanism 1
- DNOs 1
- distribution network operator 1
- energy storage 1
- Hydrogen economy 1
- Support schemes 1
- CRM 1
- DSOs 1
- Capacity Auction 1
- Capacity Payment Mechanism 1
- Ireland 1
- SONI 1
- Clearing price 1
- Hydrogen 1
- ED2 1
- electricity market design 1
- Net zero Transaction 1
- Net zero Carbon emissions 1
- transaction 1
- Insight paper 1
- Heat technologies 1
- merchant 1
- renewables 1
- wind 1
- wind farm 1
- Power system 1
- Road map 1
- cost variable renewables 1
- Network innovation allowance 1
- devloper 1
- National Grid Electricity System Operator 1
- Western Power Distribution 1
- Disribution and transmission networks 1
- Fleet charging 1
- Electric Vehicles 1
- EV fleet transition 1
- RESS2 1
- RIIO 1
- Regional flexibility 1
- 2050 Targets 1
- Carbon 1
- self-sustaining 1
- Flexible 1
- Congestion 1
- policy 1
- Network development 1
- Road to Zero 1
- Wind farms 1
- Energy purchasing 1
- CPPA 1
- Low carbon 1
- Shakespeare Martineau 1
- Transmission systems 1
- Wholesale market structure 1
- Generation mix 1
- Network charges 1
- Balancing 1
- Network access 1
- Micro-generation export 1
- Low-carbon generators 1
- EV 1
- Subsidies 1
- FiT 1
- Renewable Obligation 1
- RO 1
- Cannibalisation 1
- Wholesale electricity price 1
- Fuel costs 1
- Crystallisation 1
- Consumer demand 1
- Community Energy Scheme 1
- Balancing and Settlement Code 1
- BSC 1
- Auctions 1
- Procurement 1
- Offshore Wind 1
- I-SEM 1
- SEM 1
- RESS 1
- Solar power 1
RESS2
-
Low carbon generation
Merchant renewables still face challenges
In light of delayed RESS-2 auctions in Ireland, and the prospect of buying constraints in the next CfD auction (for established technologies) leading to many disappointed developers, the question of whether “merchant” project development is viable will soon be occupying the minds of our customers in both Ireland and Great...